One of the federal flat at nearly completed in saratok. i not sure wat grade it is,F or G o sumting.hahaha.

The Actual Ting

The kitchen

protective bar

pretty nice dun u tink?hhahaha,nampak jua marshall.

okla hoooo

the master bedrum

the pipe conection 2 every rum. available in every floor

lupa dah apa benda tok. mayb lighting conductor to the ground?i dun noe la

dapur lagi

d control panel 4 d pumps. 4 buildings more than 3 floor high, theres a pump tat pumping water to the top tank.

cool

Air pump
No comments:
Post a Comment