i got 3 day to spend in Water Treatment Plant nanga lichok and honestly i like it. i never spend more than 5 hours in treatment plant before (batu kitang). i have the chance to meet new people (staff) and they are really really friendly. answer everyting that we ask them and show us around eventho we already been to that place before.hahahah

raw water pump

raw water being pump in - 12mld

ok tiz is the weir that JKR built at the end of the river. the main purpose is to reduce the velocity of the flowing river stream and make it easier for the pumps to collect the raw water.

in front of the main building.

the overview of the plant. as u can see,theres the flocculation tank,sedi tank,filtration tank and the main building.

The sedimentation tank.

the staff helping each other changing the chlorine tank

DangerDAnger!!

Chlorine gas regulator - control the amount of chlorine gas dosing

me and kazirul

step by step procedure of backwash

one of the filtration tank

Backwash is process

for use to fine chlorine and Ph

watching one of the chemist performing sampling of treated and raw water

theres something wrong with the machine.one of the workers checking out the broken control panel.

the river's weir.

raw water pump

all the equipment necessary for water sampling and jar test

our turbidity result

chlorine test

measurement of Ph level

lucky me!!!.i have the chance doin the jar test. inserting alum into the raw water

jar test speed

one of the equipment being use. this is a pippet

the staff checking the dosage of alum and soda ash

i can drive tiz guys!!!4 real