i got 3 day to spend in Water Treatment Plant nanga lichok and honestly i like it. i never spend more than 5 hours in treatment plant before (batu kitang). i have the chance to meet new people (staff) and they are really really friendly. answer everyting that we ask them and show us around eventho we already been to that place before.hahahah
raw water pump
raw water being pump in - 12mld
ok tiz is the weir that JKR built at the end of the river. the main purpose is to reduce the velocity of the flowing river stream and make it easier for the pumps to collect the raw water.
in front of the main building.
the overview of the plant. as u can see,theres the flocculation tank,sedi tank,filtration tank and the main building.
The sedimentation tank.
the staff helping each other changing the chlorine tank
DangerDAnger!!
Chlorine gas regulator - control the amount of chlorine gas dosing
me and kazirul
step by step procedure of backwash
one of the filtration tank
Backwash is process
for use to fine chlorine and Ph
watching one of the chemist performing sampling of treated and raw water
theres something wrong with the machine.one of the workers checking out the broken control panel.
the river's weir.
raw water pump
all the equipment necessary for water sampling and jar test
our turbidity result
chlorine test
measurement of Ph level
lucky me!!!.i have the chance doin the jar test. inserting alum into the raw water
jar test speed
one of the equipment being use. this is a pippet
the staff checking the dosage of alum and soda ash
i can drive tiz guys!!!4 real
2 comments:
I hope u enjoy your days in JKR Saratok...acquire more knowledge for your future. Good Work
thanx boz. the feeling is mutual.
Post a Comment